La Son Industrial Park Phase 1 – Thua Thien Hue Province

La Son Industrial Park Phase 1 – Thua Thien Hue Province – Area: 85.8 ha – Land lease term: Until 2065 

La Son Industrial Park Phase 1 – Thua Thien Hue Province

La Son IP covers a total area of 300 ha in Loc Son Commune, Phu Loc District, Thua Thien Hue Province. Phase 1 spans approximately 85.8 ha and is developed by Vitto Infrastructure Co., Ltd. It lies across Loc Son and Loc Bon communes and is detailed in the 1:2000 zoning plan:

North: adjacent to residential area of Loc Son commune

South: bordering reserved zone 02 of La Son IP

East: Next to provincial road 14B

West: alongside planned green belt within La Son IP

Location

Nestled Next to National Highway 1A and the North–South Railway, La Son IP Phase 1 offers excellent connectivity to key transport modes: road, rail, sea, air, and inland waterways.

La Son Industrial Park Phase 1 – Thua Thien Hue Province

Infrastructure

Internal Roads:

Main axis road: 31 m wide from entrance on 14B connecting all zones

Branch roads: 15.5 m wide (4 m + 7.5 m + 4 m)

Power Supply:

Connected to the 110 kV national transmission line (east side)

Includes 110/35/22 kV substation (1×25 MVA) and transformer stations (22/0.4 kV) for each factory as needed

Public Lighting: Dedicated lighting system along roadways

Water Supply:

Industrial water supply: 30 m³ per hectare of industrial land

Water sourced from Loc An water plant and Song Nong plant

Drainage:

Separate systems for stormwater and wastewater

Rainwater is channeled into park canals

Solid-Waste Treatment:

Collected and concentrated at factory-level points

Transport arranged by park sanitation team

Hazardous wastes must be pre-treated before disposal

Wastewater Treatment:

On-site pre-treatment to meet industrial environmental standards

Collected into central treatment system in north zone

Treated water is discharged into local drainage network

Telecom:

International-standard telecom systems via VNPT, Viettel, Mobifone

Key Industries

La Son IP Phase 1 is a comprehensive industrial zone that prioritizes high-tech, light, and clean industries including:

  • High-tech manufacturing
  • Clean/light industrial plants
  • Eco-friendly industrial facilities

Labor Costs

Located in Loc Son and Loc Bon communes (Region III), the minimum wage must comply with the current Region III rate of 3,250,000 VND/month.

Social Infrastructure & Support

Customs: Nearby Customs Department for smooth import/export procedures

Banking: Branches of BIDV, Agribank, Techcombank, Sacombank, etc.

Postal Services: Door-to-door postal delivery

Public Transport: Access to both intra- and inter-provincial bus services

Fire Safety: Dedicated professional fire&rescue team onsite, equipped with modern tools

Security: 24/7 security services

Housing: Close to urban residential areas, facilitating staff accommodation

Healthcare: Served by local hospitals and district health centers in Phu Loc District

Education: Province-wide education infrastructure including universities, vocational training, and a comprehensive school system (preschool to high school), targeting full capacity by 2030.

(Note: all information above is for reference only. Actual information will be calculated according to the current time)

💠Learn more about us:

🏢 Blue Ocean Realty

Your trusted partner in Vietnam Real Estate, Industrial Parks, and Invest Vietnam.

Stay Connected:

📲 Hotline/ Zalo: +84888089696

Compare listings

Compare
Robert
  • Robert
Gọi Hotline
zalo-icon
Chat Facebook