Phong Dien – Viglacera Industrial Park, Thua Thien Hue Province – Area: 284.32 ha – Lease term: Until 2064 – Hotline: +84888089696

Established by Decision No. 2854/QDUBND on December 31, 2014, the park is developed by Viglacera Joint Stock Corporation. Total area of 284.32 ha, built in three phases:
Phase 1: 64 ha, completed land compensation, land use certificate issued on November 21, 2016.
Phase 2: Two lots (46.2 ha + 42.1 ha).
Phase 3: Two lots totaling 131.42 ha.
Infrastructure—roads, stormwater/sewage systems, street lighting—has been largely completed for Phases 1 and 2.
Located in Phong Hóa, Phong Hiền communes and Phong Điền Town, Phong Điền District, the park is adjacent to Highway 9, near Highway 1A and the North–South Railway.

Road Network: Grid layout; main roads 35 m wide, internal roads 16.5 m wide.
Power Supply: Supplied from national grid via 110 / 22 kV substation (40 MVA).
Street Lighting: Dedicated network along main roads.
Water Supply: 11,000 m³/day capacity delivery to factory gates.
Drainage: Stormwater and wastewater systems separate; rainwater discharged into park canals.
Solid Waste Management: Waste sorted at source, transported to transfer station, then processed externally.
Wastewater Treatment: Central treatment facility with 8,500 m³/day capacity.
Telecom: International-standard telecom and postal services.
Multi-sector park attracting:
Located in Region III, the minimum regional wage is 3,250,000 VND/month.
Customs: Nearby local customs office.
Banking: Branches of BIDV, Agribank, Techcombank, Sacombank available.
Postal: Door-to-door postal services.
Transport: Intra- and inter-provincial buses accessible.
Firefighting: National-standard fire protection system with hydrants along roads.
Security: 24/7 security services.
Housing: Near built-up residential areas for workforce accommodation.
Healthcare: Town-level medical network supports worker healthcare.
Education: Province-wide educational infrastructure: 2 universities, 1 academy, 5 colleges, 1 vocational school, ~7 vocational training centers; 218 preschools, 220 primary schools, 131 secondary schools, 42 high schools; planned expansion by 2030.
(Note: all information above is for reference only. Actual information will be calculated according to the current time)
💠Learn more about us:
—
Your trusted partner in Vietnam Real Estate, Industrial Parks, and Invest Vietnam.
Stay Connected:
📲 Hotline/ Zalo: +84888089696
—
Compare listings
ComparePlease enter your username or email address. You will receive a link to create a new password via email.