Bac Duyen Hai Industrial Park – Lao Cai Province

Bac Duyen Hai Industrial Park – Lao Cai Province. Area: 85 ha – Operation Term: Until 2062

Bac Duyen Hai Industrial Park – Lao Cai Province

General Introduction
The detailed 1:2000 master plan for Bac Duyen Hai Industrial Park was approved by the People’s Committee of Lao Cai Province under Decision No. 1023/QĐ-UBND dated May 11, 2012.
Bac Duyen Hai Industrial Park was converted from the Bac Duyen Hai Industrial Cluster with a total planned area of 85 ha, located in Duyen Hai Ward, Lao Cai City. The park has now been fully occupied.

Location

The industrial park serves as a strategic connection between Lao Cai City and the Kim Thanh Trade Zone, making it highly convenient for logistics centers, high-end building material production, mechanical workshops, handicrafts, and small-scale clean industries.

Bac Duyen Hai Industrial Park – Lao Cai Province

Infrastructure

Internal Transportation
The internal road network is fully developed, allowing smooth traffic and convenient transport of goods. The main roads have four lanes, and branch roads have two lanes.

Power Supply
The park ensures stable and continuous electricity for all factories.
Street lighting systems are independently designed and installed along all main and branch roads.

Water Supply and Drainage
Water pipelines are installed up to each factory’s fence.
Rainwater and wastewater drainage systems are separated to ensure efficient flow management.

Waste and Wastewater Treatment
All investors sign contracts with licensed professional waste collection and treatment companies.
Wastewater is treated to meet Grade A national standards before being discharged into the environment.

Telecommunications
The entire industrial park is fully covered by major telecom operators such as VNPT, Viettel, and FPT Telecom, providing global connectivity through a modern fiber-optic network.

Supported Industries

Bac Duyen Hai Industrial Park accommodates a variety of clean industries such as:

  • Handicrafts and household goods manufacturing
  • Mechanical and agricultural machinery production
  • Auto and construction equipment repair
  • Electronics and refrigeration manufacturing
  • Logistics, storage, and supporting services

Labor costs

Located in Lao Cai City (Region II), the current minimum regional wage is VND 3,920,000 per month.

Social Infrastructure

  • Customs Services: Located nearby, ensuring fast and convenient customs clearance.
  • Banks: VietinBank, BIDV, Vietcombank, Shinhan Bank, and Techcombank have transaction offices and ATMs within the park, offering easy access to financial services.
  • Post Office: Local post offices provide prompt and reliable services for investors and workers.
  • Public Transport: Extensive bus routes connect the park with Hai Duong, Hanoi, Quang Ninh, Hai Phong, Phu Tho, Tuyen Quang, and Thai Nguyen.
  • Firefighting: Equipped with a modern fire hydrant network and regularly trained emergency response teams, maintaining the highest safety standards.
  • Housing: The park is adjacent to residential areas, ensuring convenient accommodation and daily living for workers.
  • Healthcare: Nearby healthcare facilities from commune to district levels provide full medical services for workers.
  • Education: A complete school system from kindergarten to high school serves both local residents and workers’ families.

(Note: all information above is for reference only. Actual information will be calculated according to the current time)

💠Learn more about us:

—

🏢 Blue Ocean Realty

Your trusted partner in Vietnam Real Estate, Industrial Parks, and Invest Vietnam.

Stay Connected:

📲 Hotline/ Zalo: +84888089696

—

 

Compare listings

Compare
Robert
  • Robert
Gọi Hotline
zalo-icon
Chat Facebook