Dai An Expansion Industrial Park (Phase1) – Hai Duong | Area: 189.02 hectares – Term: Until 2058
In May 2016, the Hai Duong Provincial People’s Committee approved the detailed construction plan for the expansion of Dai An Industrial Park. The total construction area of the expanded Dai An Industrial Park is 416.21 hectares, with Phase I covering 189.02 hectares. This industrial park aims to become a model industrial park of Vietnam, with infrastructure and services meeting international standards. The project is invested by Dai An Industrial Park Infrastructure Development Co., Ltd. As of the end of August 2019, the industrial park has attracted 47 secondary investment projects with a total investment of nearly 1.2 billion USD. Of these, 33 projects have begun production operations.
Dai An Expansion Industrial Park (Phase I) is located in Lai Cach Town, Cam Giang District, Hai Duong Province. It is situated near National Route 5, connecting Hanoi, Hung Yen, Hai Duong, and Hai Phong, offering convenient transportation for goods movement.
Internal Roads: The internal road system has cross-sections of 39m, 35.5m, and 33m.
Electricity Supply: The electricity is sourced from 22KV and 110kVA substations (two 63,000KVA transformers) connected to the national grid. It ensures a stable 24/7 power supply for production enterprises, even during peak seasons, and can be tailored to meet individual company needs.
Water Supply: The water system provides 20,000m³ per day (supplied by Hai Duong Province’s clean water company).
Stormwater and Wastewater Drainage: The stormwater and wastewater systems are independently designed as separate systems.
Waste Management: Investors will sign service contracts with professional waste management companies.
Telecommunications: Internet services include ADLS broadband, international telecommunications (IDD), fiber optic cables, and leased lines.
Telephone: Phone lines are provided based on investor requirements.
Dai An Expansion Industrial Park (Phase I) mainly attracts industries such as:
Dai An Expansion Industrial Park (Phase I) is located in Cam Giang District, which is in Region III. The current minimum wage for Region III is VND 3,430,000/month.
Customs Services: The Customs office is located near the industrial park.
Banks: Oceanbank, Vietcombank, BIDV, PG Bank, Seabank, Vietinbank, Techcombank, etc. in Hai Duong City.
Postal Services: TDT Express, VNPT, DHL, PedEx, TNT, etc. offer door-to-door delivery.
Bus Routes: Bus routes to Hai Duong, Hanoi, Quang Ninh, Hai Phong, and other locations.
Firefighting: The park has a national-standard fire prevention and firefighting system, with fire hydrants along the industrial park’s roads to ensure effective fire safety.
Security: 24/7 security services are available.
Housing: Dormitories are available for employees:
5-story buildings with 20 rooms
Room sizes from 88m² to 122m²
Each room accommodates 4-6 people
Luxurious design
Healthcare: The industrial park is 7 km from Hai Duong General Hospital and 5 km from Cam Giang District Medical Center.
Schools:
Hai Duong Vocational College
Vocational College No. 20, Ministry of Defense
Primary, secondary, and high schools surrounding the industrial park.
(Note: all information above is for reference only. Actual information will be calculated according to the current time)
—
🏢 Investing Vietnam – Vietnam Real Estate – Vietnam industrial park – Blue Ocean Realty
👍 Fanpage: blueoceanrealtyvn
▶️ Youtube: BlueOceanRealty , @batdongsanbor , @blueoceanrealtyvietnam
📸 Instagram: blueoceanrealtyvn
💃 Tiktok: @bortintuc
📲 Hotline/ Zalo: +84888089696
—
Please enter your username or email address. You will receive a link to create a new password via email.