Dai An Industrial Park Expansion (Phase2) - Hai Duong
Dai An Industrial Park Expansion (Phase2) – Hai Duong | Area: 227ha- Term: Until 2071
In May 2016, the Hai Duong Provincial People’s Committee approved adjustments to the detailed planning of the Dai An Industrial Park Expansion. With a total planned construction area of 416.21ha, the Phase II development, spanning 227ha, was officially established on May 7, 2021. This phase is developed by Dai An Joint Stock Company, aiming to create a multi-sector industrial park that excludes heavy industry and pollution-intensive activities. Enterprises operating here must employ advanced technologies and implement wastewater treatment systems that meet stringent standards. Land clearance efforts for Phase II are currently being expedited.
Location
Dai An Industrial Park Expansion (Phase II) is located in Tu Minh Ward, Hai Duong City, as well as in the communes of Cam Dong, Cam Doai, and Lai Cach Town in Cam Giang District, Hai Duong Province. Situated adjacent to National Highway 5, which links Hanoi, Hung Yen, Hai Duong, and Hai Phong, this location offers significant advantages for logistics and goods transportation.
Infrastructure
Internal Roads Road widths: 39m, 35.5m, 33m Electricity System Power supply: 22KV and a 110KVA substation (two transformers, each 63,000KVA) connected to the national grid. Ensures a stable 24/7 power supply, even during peak seasons, with options for customized supply based on enterprise needs. Water Supply Capacity: 20,000m³/day and night, supplied by Hai Duong Provincial Clean Water Company. Drainage System Separate drainage systems for wastewater and rainwater. Waste Management Investors sign contracts with professional waste management companies for solid waste processing. Telecommunications Broadband internet (ADSL), international telecommunications (IDD), fiber-optic cables, and leased lines available. Telephone lines provided based on investor demand.
Labor costs
The industrial park spans both Region III (Cam Giang District) and Region II (Tu Minh Ward, Hai Duong City):
Region III minimum wage: VND 3,430,000/month
Region II minimum wage: VND 3,920,000/month
Social infrastructure
Customs Services Customs office located near the industrial park. Banking Banks available in Hai Duong City include Oceanbank, Vietcombank, BIDV, PG Bank, Seabank, Vietinbank, and Techcombank. Postal Services TDT Express, VNPT, DHL, FedEx, TNT, and other courier services offer door-to-door delivery. Bus Routes Extensive bus network connecting Hai Duong, Hanoi, Quang Ninh, and Hai Phong. Fire Safety National-standard fire prevention and firefighting systems, with fire hydrants positioned along the main roads. Security 24/7 security services. Housing Worker dormitories: Five-story buildings with 20 rooms. Room sizes: 88m²–122m², accommodating 4–6 people per room. Modern and luxurious design. Healthcare Proximity to Hai Duong General Hospital (7km) and Cam Giang District Medical Center (5km). Education Nearby educational facilities: Hai Duong Vocational College, Vocational College No. 20 (Ministry of National Defense), and primary, secondary, and high schools surrounding the industrial park.
Investment Highlights
Strategic Location: Adjacent to major national highways and key transportation routes.
Eco-friendly Focus: Emphasis on non-polluting industries with advanced technology.
Modern Infrastructure: Comprehensive facilities and utilities, tailored to investor needs.
Flexible Policies: Streamlined administrative procedures to attract investment.
(Note: all information above is for reference only. Actual information will be calculated according to the current time)