Hoa Cam Industrial Park – Da Nang City. Area: 136.73 hectares – Term: Until 2053
Hoa Cam Industrial Park (IP) was established under Decision No. 1252/QĐ-BXD dated September 19, 2003, by the Ministry of Construction, approving the detailed master plan for Hoa Cam IP in Da Nang City. It is located in Hoa Tho Tay Ward, Cam Le District, Da Nang City. Initially, the Da Nang Industrial Infrastructure Development and Operation Company was the main investor. The park is now managed by Hoa Cam Industrial Park Investment Joint Stock Company (IZI).
Construction of the park began in 2003, with a total area of 137 hectares in Phase 1. In 2011, the area was adjusted to 136.73 hectares under Decision No. 6357/QĐ-UBND dated July 28, 2011, by the Da Nang People’s Committee. On April 3, 2008, Hoa Cam IZI officially took over management of the IP under Decision No. 2768/QĐ-UBND, transferring investment rights from Da Nang Industrial Infrastructure Development and Operation Company (Daizico) to Hoa Cam IZI.
Investment Attraction
Hoa Cam IP has attracted a total of 60 investment projects, covering 81.85 hectares of leased land out of 96.13 hectares planned for lease (equivalent to 85.15%). These include:
Strategically located in the southwest of Da Nang City, adjacent to National Highway 14B and the East-West Economic Corridor. Among the five industrial parks in Da Nang, Hoa Cam IP holds one of the most favorable locations with close proximity to key infrastructure of the city.
Internal Transportation
The road system is designed in a grid pattern, ensuring easy access to each land lot. The three main roads run from National Highway 14B to the park’s center, dividing the area into four zones.
Electricity Supply
Power is supplied from Cau Do Substation (110/35/22KV – 2×25 MVA). A 22KV dual circuit grid delivers electricity to individual 22/0.4KA substations for each enterprise. Investors are only responsible for connections beyond these substations.
Street Lighting
The public lighting network is designed separately from the residential power supply system and installed along the main roads.
Water Supply
Water is sourced from the Cau Do Water Plant, with a capacity of 210,000 m³/day, connected via a Ø200 pipeline along National Highway 14B.
Wastewater & Rainwater Drainage
Separate systems are in place:
Solid Waste Management
Solid waste is collected at a central transfer station, sorted at the source, and transported to a treatment facility.
Wastewater Treatment
The park’s wastewater treatment plant has a capacity of 4,000 m³/day, ensuring all discharged wastewater meets TCVN 5945-2005 standards.
Telecommunications
The park offers international-standard telecom infrastructure, meeting high-speed data, voice, and postal demands. Phone and ADSL lines are available for each enterprise.
Hoa Cam IP is designated as a clean industrial park, focusing on non-polluting, high-tech industries such as:
Hoa Cam IP is located in Hoa Tho Tay Ward, Cam Le District, Da Nang City – Region II. Therefore, the minimum wage for Region II in 2025 is VND 4,410,000/month.
(Note: all information above is for reference only. Actual information will be calculated according to the current time)
💠Learn more about us:
—
Your trusted partner in Vietnam Real Estate, Industrial Parks, and Invest Vietnam.
Stay Connected:
📲 Hotline/ Zalo: +84888089696
—
Please enter your username or email address. You will receive a link to create a new password via email.