Thai Hoa Lien Son Lien Hoa Industrial Park Subzone 2 - Vinh Phuc

Thai Hoa Lien Son Lien Hoa Industrial Park Subzone 2 – Vinh Phuc. Area of Phase 1: 145.27 HA – Term: 2071

Khu Công nghiệp Thái Hòa- Liễn Sơn- Liên Hòa Phân khu 2-  Vĩnh Phúc

Overview

The Thai Hoa – Lien Son – Lien Hoa Industrial Park was approved for inclusion in the master plan of industrial parks in Vinh Phuc province according to Document No. 1581/TTg-KTN dated September 3, 2009, by the Prime Minister, with a projected planning area of 600 ha.

The industrial park has been approved by the Vinh Phuc Provincial People’s Committee for detailed planning over a total area of 498.95 ha, with two subzones as follows:

Thai Hoa – Lien Son – Lien Hoa Industrial Park – Zone 1 (or Thai Hoa Industrial Park, Bac Binh), with an area of 283.37 ha, located in Thai Hoa and Bac Binh communes, Lap Thach district, Vinh Phuc province, currently without an infrastructure investor.

Thai Hoa – Lien Son – Lien Hoa Industrial Park – Zone 2 (or Lien Son, Lien Hoa, Hoa Son, Tu Du Industrial Park), with a planned area of 281.2981 ha, located in Hoa Son town, Lien Son, Lien Hoa, Tu Du communes, Lap Thach district, Vinh Phuc province.

On November 26, 2013, the detailed planning at 1/2000 scale was approved in Decision No. 3425/QD-UBND. On February 26, 2021, the Prime Minister approved the investment policy for Phase 1 of the Thai Hoa – Lien Son – Lien Hoa Industrial Park in Decision No. 283/QD-TTg. Phase 1 of the project covers an area of 145.27 ha, located in Hoa Son town and Lien Hoa, Lien Son communes. The project is invested by Amane Investment Joint Stock Company with a total investment of over 774 billion VND, and the operation Term is 50 years (2021-2071).

Location

The Thai Hoa – Lien Son – Lien Hoa Industrial Park is adjacent to National Highway 2C leading to Lien Son Bridge at the Van Quan interchange, connecting to the Noi Bai – Lao Cai Expressway. Additionally, it is accessible via Provincial Road 306 with a 24m cross-section.

Khu Công nghiệp Thái Hòa- Liễn Sơn- Liên Hòa Phân khu 2-  Vĩnh Phúc

Infrastructure

Internal Transport:
The industrial park has a complete, synchronized internal traffic system. The internal roads include a main road up to 36.5m wide, with branch roads ranging from 19.5m in width.

Power Supply:
The power supply system includes 110/35/22KV power lines with a source capacity of 150MWH, arranged next to factory walls.

Public Lighting System:
Street lighting is designed separately from the domestic power system and is distributed along the main roads.

Water Supply System:
The water supply capacity is 6,000-8,000m3/day, with clean water provided to the factory perimeter.

Wastewater and Rainwater Drainage System:
The industrial park has a separate drainage system for rainwater and wastewater, along internal roads. Rainwater is discharged directly into receiving sources, while wastewater is collected and treated at the industrial park’s centralized wastewater treatment plant to meet environmental discharge standards.

Waste Management:
Solid waste within the industrial park will be collected at a transfer station, sorted at the source, and then transported to the treatment area.

Wastewater Treatment:
The centralized wastewater treatment plant has a capacity of 4,000 m3/day, with Phase 1 capacity at 2,000 m3 and Phase 2 at 2,000 m3.

Communication System:
The communication system is provided by network providers such as VNPT, FPT, Viettel, with multi-network, multi-frequency coverage, and is developed in coordination with the park’s technical infrastructure.

Supported Industries

The Thai Hoa – Lien Son – Lien Hoa Industrial Park is attracting investment in the following industries:

  • Precision mechanics
  • Building materials production
  • Garment and leather production
  • Food and beverage production
  • Agricultural processing and consumer goods

Labor costs

The park is located within administrative areas of Huong Dao, Dao Tu communes, and Hop Hoa town, Tam Duong district, Vinh Phuc province, in Region III. Therefore, the minimum wage in Region III is 3,860,000 VND/month.

Social Infrastructure

Customs Services:
The industrial park is located near the customs area, facilitating businesses with import/export procedures, sealing, and other customs services.

Banking Services:
Branches of BIDV, Agribank, Techcombank, Sacombank, and others are available.

Postal Services:
The park is equipped with a modern IT system that supports multi-service communication, including data transmission, phone services, Internet, and video conferencing.

Public Transport:
There are buses for local and inter-provincial transportation.

Fire Protection:
The fire protection system meets national standards, with fire hydrants placed every 100-150 meters along the park’s roads.

Security:
24/7 security services are provided.

Housing:
The industrial park is close to residential areas, meeting the accommodation needs of workers.

Healthcare:
The project is located near hospitals and medical centers, providing convenient access to healthcare services.

Schools:
The industrial park is within a 2-6 km radius of kindergarten, middle school, and high school facilities.

(Note: all information above is for reference only. Actual information will be calculated according to the current time)

💠Learn more about us:

🏢 Blue Ocean Realty

Your trusted partner in Vietnam Real Estate, Industrial Parks, and Invest Vietnam.

Stay Connected:

📲 Hotline/ Zalo: +84888089696

 

Compare listings

Compare
Robert
  • Robert
Gọi Hotline
zalo-icon
Chat Facebook
Tuyen Sale