Vinh Loc Industrial Park - Ho Chi Minh City

Vinh Loc Industrial Park – Ho Chi Minh City.

Area: 207 ha (adjusted to 203.18 ha after relocation and accommodation areas) – Term: Until 2047

Khu công nghiệp (KCN) Vĩnh Lộc - TP HCM

General Information

Vinh Loc Industrial Park was established under Decision No. 81/QĐ-CP dated February 5, 1997, issued by the Prime Minister. The infrastructure investment was carried out by Cholimex (Cho Lon Import-Export and Investment Company).

The park covers an area of 207 ha, spread across three administrative areas:

  • Binh Hung Hoa B Ward, Binh Tan District (113.23 ha)
  • Vinh Loc A Commune, Binh Chanh District (84.59 ha)
  • Ba Diem Commune, Hoc Mon District (9.18 ha)

After a reduction of 3.82 ha to develop resettlement and worker accommodation areas, the park now covers 203.18 ha.

Development Timeline

  • April 30, 1997: Construction officially began.
  • During 1997-1998, the park faced challenges due to the Asia-Pacific economic crisis. However, with the support of the government, the city, and the Management Board of Export Processing Zones and Industrial Parks of Ho Chi Minh City, Vinh Loc Industrial Park gradually overcame difficulties and developed into a well-established industrial area.

Location

Vinh Loc Industrial Park is located in Vinh Loc A Commune (Binh Chanh District), Ba Diem Commune (Hoc Mon District), and Binh Hung Hoa B Ward (Binh Tan District), Ho Chi Minh City. The park is strategically positioned near National Highway 1A, accessible via Nguyen Thi Tu Road, which facilitates convenient transportation and trade.

Khu công nghiệp (KCN) Vĩnh Lộc - TP HCM

Infrastructure

Internal Roads

    • Main Roads: Width ranging from 13.75 m to 30 m, with pavement widths from 7.5 m to 15 m and sidewalks from 6.25 m to 7.5 m.
    • Secondary Roads: Width ranging from 11 m to 12.5 m, with pavement widths from 5 m to 6 m and sidewalks from 3 m to 3.25 m.

External Traffic Connections

    1. Road No. 7 Extension:
      • Length: 496 m, connecting the industrial park with National Highway 1A.
      • Total width: 80 m, including two 15 m lanes, 4 m median, 6 m sidewalks, and 17 m green space.
    2. Nguyen Thi Tu Road:
      • Length: 800 m within the industrial park, connecting to National Highway 1A and Provincial Road 80.
      • Total width: 40 m, with two 11 m lanes, 2 m median, and 8 m sidewalks.
    3. Road No. 2:
      • Length: 1,210 m, linking the park with National Highway 1 and Provincial Road 13.
      • Total width: 45 m, including 15 m pavement, two 2 m medians, 7 m service roads, and 6 m sidewalks.

Power Supply

The industrial park has constructed a 2×40 MVA substation on Road No. 7, along with power distribution systems along internal roads, ensuring stable power supply for all enterprises.

Public Lighting

The street lighting system is separately designed from residential power supply, installed along all main roads.

Water Supply and Drainage

Water Supply System

    • 7 pumping wells with a total capacity of 12,000 m³/day-night.
    • Total pipeline length: 9,200 m, covering 60% of the entire route.

Rainwater Drainage System

    • Completed length: 25,841 m of rainwater drainage lines.

Wastewater Drainage System

    • Completed length: 5,171 m of wastewater drainage lines.

Wastewater Treatment

    • Centralized treatment plant: Capacity of 4,500 – 6,000 m³/day-night, operational since 2008.

Waste Management

Investors are required to sign contracts with licensed waste disposal units to ensure safe and compliant waste management.

Telecommunication System

The park is equipped with a high-speed telecommunication system meeting international standards, in collaboration with VNPT and other telecom service providers.

Key Industries

Key Industries

Vinh Loc Industrial Park mainly attracts non-polluting industries, including:

  • Mechanical Engineering and Assembly
  • Electronics and Electrical Appliances
  • Textile, Garment, Leather Processing
  • Food and Agricultural Processing
  • Household Electrical Equipment
  • Metal Products and Packaging (Carton, Plastic)
  • Pharmaceuticals and Medical Products
  • Gas and Tobacco Products

Labor Costs

Vinh Loc Industrial Park is located in Region I, so the current regional minimum wage is 4,960,000 VND/month.

Social Infrastructure

Customs and Logistics

  • Customs Services: Efficient import-export procedures.
  • Banks: Oceanbank, Vietcombank, BIDV, PG Bank, Seabank, Vietinbank, Techcombank, etc.
  • Postal and Delivery Services: TDT Express, VNPT, DHL, FedEx, TNT with door-to-door service.
  • Public Transport: Extensive bus network connecting the park to surrounding provinces.
  • Fire Safety: Hydrants are installed every 150 m along the sidewalks, connected to the clean water system.

Accommodation and Living Facilities

  • Residential Areas: Proximity to bustling residential zones, ensuring easy accommodation for workers.
  • Healthcare: Comprehensive medical services are available in Hoc Mon District and Binh Tan District to cater to employees’ healthcare needs.
  • Education: A complete educational system from kindergarten to high school is established within the area.

Conclusion

Vinh Loc Industrial Park, with its strategic location and comprehensive infrastructure, serves as a significant industrial hub in Ho Chi Minh City, fostering economic growth and providing a favorable environment for industrial investment and development.

(Note: all information above is for reference only. Actual information will be calculated according to the current time)

💠Learn more about us:

🏢 Blue Ocean Realty

Your trusted partner in Vietnam Real Estate, Industrial Parks, and Invest Vietnam.

Stay Connected:

📲 Hotline/ Zalo: +84888089696

Compare listings

Compare
Robert
  • Robert
Gọi Hotline
zalo-icon
Chat Facebook