Tam Anh – An An Hoa Industrial Park – Quang Nam Province – Total area: 435.8 hectares – Land lease term: Until 2071

GENERAL OVERVIEW
In 2021, Deputy Prime Minister Trinh Dinh Dung approved the investment policy for the Tam Anh – An An Hoa Industrial Park Infrastructure Development and Operation Project, implemented by An An Hoa Industrial and Urban JSC. The project covers 435.8 hectares with a total registered investment capital of VND 1,540 billion.
On September 23, 2022, Deputy Prime Minister Le Van Thanh signed Decision No. 1125/QD-TTg, amending Decision No. 397/QD-TTg (dated March 19, 2021), officially adjusting the location of the industrial park to span both Tam Anh Nam and Tam Anh Bac Communes (Previously only Tam Anh Nam), within the Chu Lai Open Economic Zone.
Currently, the investor is cooperating with local authorities on site clearance.
Tam Anh – An An Hoa Industrial Park is located in Tam Anh Nam and Tam Anh Bac Communes, Nui Thanh District, Quang Nam Province.

Internal Roads
Integrated internal and external road systems support efficient transportation and logistics.
Electricity
Electric power is supplied to the factory boundaries, ensuring stable service for industrial activities.
Public Lighting
A separate street lighting grid is installed along all main road corridors, independent from the residential power system.
Water Supply
Water for production is provided by the Quang Nam Water Supply Plant.
Drainage Systems
Stormwater and wastewater are managed by separate systems. Rainwater is discharged into designated drainage channels within the industrial park.
Solid Waste Management
Solid waste is collected at a central transfer station, sorted at source, and transported to authorized treatment facilities.
Wastewater Treatment
Enterprises must treat wastewater to Column B standards before releasing it into the centralized wastewater system.
The centralized system further treats it to Column A in compliance with QCVN 40:2011/BTNMT and QCVN 13-MT:2015/BTNMT by the Ministry of Natural Resources and Environment.
Telecommunications
Equipped with international-standard telecom infrastructure, including VNPT fiber-optic lines, offering high-speed data transmission and domestic/international postal services.
The park is in Region III, where the minimum monthly wage is VND 3,250,000.
Customs Services: Located close to a customs clearance area to support efficient import-export procedures
Banking: Local branches of BIDV, Agribank, Techcombank, Sacombank, etc.
Postal Services: Door-to-door postal services
Public Transport: Both intra- and inter-provincial buses available
Fire Safety: Fire Prevention and fighting system complies with national standards, including fire hydrants installed throughout the zone
Security: 24/7 security service
Worker Housing: Proximity to populous residential areas ensures availability of housing and daily necessities for workers
Healthcare: Access to many medical centers and general clinics, 24/7 emergency care available at:
Quang Nam Central General Hospital
Quang Nam General Hospital
Minh Thien Hospital
Pacific Hospital
Tam Ky City Medical Center
Education:
2 universities, 7 colleges, 3 intermediate schools
Approx. 40 vocational schools in fields like foreign languages, tailoring, welding, mechanics, casting, CNC…
50 high schools
Over 9,000 graduates annually
(Note: all information above is for reference only. Actual information will be calculated according to the current time)
💠Learn more about us:
—
Your trusted partner in Vietnam Real Estate, Industrial Parks, and Invest Vietnam.
Stay Connected:
📲 Hotline/ Zalo: +84888089696
—
Compare listings
ComparePlease enter your username or email address. You will receive a link to create a new password via email.