Phuoc Dong Port Industrial Park – Long An Province – Total Area: 128.8 ha – Operational Term: Until 2070

General Introduction
On March 21, 2021, Long An Province held the inauguration ceremony of Phuoc Dong Port Industrial Park, developed by IMG Phuoc Dong Joint Stock Company. Covering a total planned area of 128.8 hectares, the industrial park is located in the Southern Key Economic Region and is designed as a modern, eco-friendly, and green industrial park.
The green belt surrounding the park creates a harmonious landscape, highlighting the beauty of the adjacent river. Notably, the park utilizes a rooftop solar power system with a capacity of 30 megawatts across its warehouse complexes.
IMG Phuoc Dong Port Industrial Park is one of only two seaports in Long An Province. With a total investment capital of USD 430 million (divided into two phases), the project is expected to reach break-even within 8 years, generating an annual revenue of USD 60 million.
The industrial park and port are located in Phuoc Dong Commune, Can Duoc District, Long An Province, within the Southern Key Economic Region, with a large labor supply from neighboring provinces and Ho Chi Minh City.
The project is accessible via Provincial Road 826B, which connects directly to National Highway 50, enabling travel to Ho Chi Minh City and the Mekong Delta provinces in less than an hour.
Phuoc Dong Port serves as a transshipment hub for the dynamic Western Region and international trade, integrated into Vietnam’s inland waterway port system. It also connects conveniently with major gateways such as Tan Son Nhat International Airport, Long An International Port, Cat Lai Port, and Cai Mep Port, making it a strong magnet for future investors.

Internal Roads
Main roads: 4 lanes, 16 m wide.
Internal roads: 2 lanes, 8 m wide, with sidewalks and green landscaping.
Power Supply
Substation capacity: 30 MW.
Transmission: 110 kV, distribution: 22 kV.
Public lighting system installed along traffic routes.
Water Supply
Supplied by Can Duoc Water Plant: capacity 5,000 m³/day.
Drainage System
Separate stormwater and wastewater networks.
Rainwater discharged into the park’s drainage channels.
Solid Waste Management
Waste collected at transfer stations, sorted at source, and transported to treatment facilities.
Wastewater Treatment
Centralized wastewater treatment plant with capacity of 3,000 m³/day, meeting national environmental standards before discharge.
Telecommunications
Underground fiber-optic system ensuring full telecom services (internet, data, voice, conferencing).
The industrial park is located in Region II, with a minimum wage of VND 4,160,000/month.
Customs Services: On-site customs office for import-export clearance, sealing, and inspection.
Banks: Branches of BIDV, Agribank, Techcombank, Sacombank, etc.
Postal Services: Modern IT and communication systems supporting data transfer, internet, and video conferencing.
Public Transport: Intra-provincial and inter-provincial bus services.
Fire Protection: National-standard fire safety system with hydrants every 100–150 m.
Security: 24/7 professional security services.
Housing: Adjacent to residential and resettlement areas.
Healthcare: Close to provincial general hospital and medical centers.
Education: Nursery, primary, and secondary schools within a 2–5 km radius.
(Note: all information above is for reference only. Actual information will be calculated according to the current time)
💠Learn more about us:
—
Your trusted partner in Vietnam Real Estate, Industrial Parks, and Invest Vietnam.
Stay Connected:
📲 Hotline/ Zalo: +84888089696
—
Compare listings
ComparePlease enter your username or email address. You will receive a link to create a new password via email.