Hoa Cam Expansion Industrial Park - Da Nang City

Hoa Cam Expansion Industrial Park – Da Nang City. Area: 120.019 hectares | Operation Period: Until 2053

KCN Hòa Cầm mở rộng thành phố Đà Nẵng

Overview

The Hoa Cam Expansion Industrial Park, located within the existing Hoa Cam Industrial Park, is Da Nang’s closest industrial zone to the city center. Currently completing legal procedures, the park is expected to hand over land to investors in 2022. The infrastructure is developed by Hoa Cam Industrial Park Investment Joint Stock Company.

Current Status:

Land clearance completed

Awaiting updated land price appraisal from Da Nang Department of Natural Resources and Environment

Location

Positioned southwest of Da Nang along National Highway 14B (East-West Economic Corridor), the park offers exceptional connectivity:

City Center: 8km

Da Nang International Airport: 5km

Tien Sa Port: 18km

Lien Chieu Port: 7km

KCN Hòa Cầm mở rộng thành phố Đà Nẵng

Infrastructure

Internal Road Network:

Grid layout with 4 access points to National Highway 14B

3 main arterial roads (23.25m right-of-way, 11.25m carriageway, 3 lanes)

Secondary roads (16.5m right-of-way, 2 lanes)

300-400m intersection intervals for optimal traffic flow

Power Supply:

110/35/22kV Cau Do Substation (2x25MVA capacity)

Dual-circuit 22kV distribution to tenant substations

Water Supply:

Sourced from Cau Do Water Plant (210,000m³/day capacity)

Ø200mm main pipeline along Highway 14B

Wastewater Treatment:

Dedicated plant (4,000m³/day capacity)

Compliant with TCVN 5945-2005 standards

Other Utilities:

Separate stormwater drainage system

Solid waste transfer stations with on-site sorting

Fiber optic telecom network with ADSL/telephone readiness

Key Industries

As a designated “clean industrial park”, the zone prioritizes:

Electronics & precision engineering

Food processing

Advanced construction materials

Eco-friendly plastics/cosmetics/packaging

Labor Costs

Minimum Wage: 4,410,000 VND/month (Region II)

Workforce: Access to Da Nang’s skilled labor pool (590,000 workers citywide)

Social Infrastructure

Customs: On-site clearance services

Banking: Major bank branches available

Public Transport: City and inter-province bus routes

Fire Safety: Nationally certified system with roadside hydrants

Security: 24/7 monitoring

Healthcare: 18 hospitals within Da Nang

Education: 15 universities and 200+ schools in proximity

Development Timeline

2022: Land handover to investors

2023: Expected commencement of operations

(Note: all information above is for reference only. Actual information will be calculated according to the current time)

💠Learn more about us:

🏢 Blue Ocean Realty

Your trusted partner in Vietnam Real Estate, Industrial Parks, and Invest Vietnam.

Stay Connected:

📲 Hotline/ Zalo: +84888089696

Compare listings

Compare
Robert
  • Robert
Gọi Hotline
zalo-icon
Chat Facebook