Established under Decision No. 1144/QDTTg on December 22, 1998, Phu Bai IP (Phases I & II) is the first major industrial hub in the region. It features fully developed infrastructure, including wastewater treatment, bonded warehouse, and onsite customs clearance facilities.
The entire Phu Bai IP spans nearly 800 ha; Phases I & II cover 196.75 ha. It benefits from strategic logistics access via National Highway 1A and the North–South Railway, facilitating regional and international integration.

Investors & Occupancy

Hosts ~40 domestic and foreign companies (USA, Denmark, Bulgaria, Japan, Korea, China, Italy…) in sectors such as textiles, woodworking, construction materials, ceramics, and beverages.

Notable investors include Hanex Hue (Korea), Baosteel Can Making Co. Ltd., Kugler International Ltd., etc.

100% land occupancy in Phases I & II, generating ~20,000 jobs.

Location

Located in Phu Bai Ward, Huong Thuy Town, near Phu Bai International Airport and along NH1A and the North–South Railway.

Phu Bai Industrial Park – Phases I & II, Thua Thien Hue Province

Infrastructure

Internal Roads: Main roads (31–54 m wide); internal and service roads (19.5 m wide).

Power Supply: Stable electricity via two 110/22 kV substations totaling 50 MVA.

Street Lighting: Separate public lighting system.

Water Supply: 15,000 m³/day from Phu Bai Waterworks, piped to factory gates.

Drainage: Separate stormwater and sewer systems; rainwater flows into park canals.

Solid Waste: Collected, sorted at transfer station, then outsourced for processing.

Wastewater Treatment: Treatment plant capacity of 6,500 m³/day.

Telecommunications: International-standard telecom and postal services.

Key Industries

Phu Bai IP welcomes a diverse range of industries, including:

  • Agro-forest-aquatic food processing
  • Mechanical equipment manufacturing
  • Electronics and electrical product assembly
  • IT and software production
  • Textile & garment
  • Component and device manufacturing supporting the sectors above

Labor Costs

Located in Region III, the current regional minimum wage is 3,250,000 VND/month.

Social Infrastructure

Customs: Onsite customs office for import/export facilitation.

Banking: Branches of BIDV, Agribank, Techcombank, Sacombank serve the park.

Postal Services: Door-to-door postal services available.

Bus Access: Intra- and inter-provincial bus routes.

Fire Safety: National-standard fire system with hydrants, plus an onsite firefighting unit with 3 fire trucks.

Security: 24/7 professional security services.

Housing: Proximity to developed residential areas supports employee accommodation.

Healthcare: Huong Thuy District Hospital and 10 medical centers provide healthcare coverage.

Education: Region boasts 2 universities, 1 academy, 5 colleges, 1 vocational institution, ~7 training centers; also 218 preschools, 220 primaries, 131 secondary, 42 high schools—with infrastructure plans expanding to 2030.

(Note: all information above is for reference only. Actual information will be calculated according to the current time)

💠Learn more about us:

🏢 Blue Ocean Realty

Your trusted partner in Vietnam Real Estate, Industrial Parks, and Invest Vietnam.

Stay Connected:

📲 Hotline/ Zalo: +84888089696

Compare listings

Compare
Robert
  • Robert
Gọi Hotline
zalo-icon
Chat Facebook