Becamex Bau Bang Industrial Park – Binh Duong Province

Becamex Bau Bang Industrial Park – Binh Duong Province. Area: 3,166 ha – Term: 2057

Becamex Bau Bang Industrial Park was established under Decision No. 566/TTG-CN dated May 10, 2007, by the Prime Minister on the approval for the establishment of Bau Bang Industrial Park, Binh Duong Province, and the Environmental Impact Assessment approval No. 1163/QD-BTNMT dated June 3, 2008, issued by the Ministry of Natural Resources and Environment.

The Bau Bang Urban–Industrial Area, developed by Becamex IDC Corporation, started construction in Q1/2014 and officially came into operation in March 2015. Phase 1 covers 2,166 ha (including 699.24 ha of industrial land; the remainder is infrastructure and urban area). Phase 2 includes an additional 1,000 ha.
The industrial park is located in Lai Hung and Lai Uyen Communes, Bau Bang District, Binh Duong Province. It has now expanded into Phase 2, adding 1,000 ha under the name “Bau Bang Expanded Industrial Park.”

Becamex Bau Bang Industrial Park is a multi-industry zone. Notably, according to Conclusion Notice No. 216/TB-UBND dated September 4, 2013, by the Vice Chairman of Binh Duong Province People’s Committee, the park is allowed to attract textile and garment projects, including dyeing operations. A total of 300 ha is reserved for this sector, divided into two clusters (Cluster A: 230 ha; Cluster B: 70 ha).

Location

Bau Bang Industrial Park is located in Lai Hung and Lai Uyen Communes, Bau Bang District, Binh Duong Province. This area lies within the key Southern economic quadrangle including Ho Chi Minh City, Dong Nai, and Ba Ria – Vung Tau.
From Bau Bang Industrial Park, investors can easily access Ho Chi Minh City, Thu Dau Mot City, international airports, and seaports.

Infrastructure

Internal Transportation

The entire road system in Bau Bang Industrial Park includes:

Main road: 62 m wide

Secondary roads: 15 m wide
Only 100 m from Binh Duong Boulevard (National Highway 13).
Roads are designed to withstand heavy load capacities from 40 to 60 tons per truck.

Power Supply

Electricity is supplied from the national power grid (110/22 kV), delivered up to the boundary of each land plot, ensuring 100% power demand for all enterprises.

Public Lighting System

A dedicated lighting network is installed along all main and internal roads, operating separately from the residential power supply.

Water Supply

Water supply capacity: 10,000 m³/day.
Water is treated according to WHO standards and supplied to the boundary of each land plot.

Rainwater & Wastewater Drainage

Rainwater drainage is built separately from the wastewater system.
Stormwater drains along road axes ensure efficient surface water collection and Prevent localized flooding.

Solid Waste Treatment

Investors will sign service contracts with licensed professional waste treatment providers.

Wastewater Treatment

The wastewater treatment plant has a capacity of 4,000 m³/day.
It meets national environmental standards, treating wastewater from Category B to Category A before discharging into the environment.

Telecommunications

The telecommunications network is fully connected to national and international systems with services including telephone, fax, and Internet.
Fiber optic cables support leased lines and broadband applications such as ADSL.
Telephone line supply is unlimited, based on enterprise demand.

Security

A professional security team maintains safety and order within the industrial park.
Security checkpoints are placed throughout the area, with 24/7 patrol teams.

Main industries in industrial parks

Becamex Bau Bang Industrial Park mainly attracts industries such as:

  • Electrical and household electrical equipment
  • Electronics, IT, telecommunications
  • Food and agricultural product processing
  • Machinery, automotive manufacturing, and spare parts
  • Mechanical engineering and precision engineering with plating
  • Ceramics, glass, and crystal production
  • Industrial gas production
  • Steel manufacturing
  • Medical and optical equipment
  • Sports equipment and children’s toys
  • Fiber, textile, and garment industries
  • Synthetic and leather footwear (excluding raw leather processing)
  • Pharmaceuticals, cosmetics, pesticides, veterinary medicine
  • Plastics, rubber, tires (excluding fresh rubber processing)
  • Wood processing, furniture, and construction materials
  • Packaging, printing, and paper (excluding pulp production)
  • Waste recycling industries

Labor costs

Becamex Bau Bang Industrial Park is located in Region I.
→ Current minimum wage for Region I: 4,680,000 VND/month

Social infrastructure

Customs Services: Convenient and efficient customs procedures

Banks: ATM services of Vietcombank, Incombank, etc., operating 24/24 for payment and withdrawals

Postal Services: TDT Express, VNPT, DHL, FedEx, TNT – door-to-door delivery

Bus Services: Multiple routes connecting the industrial park to neighboring provinces

Fire Prevention: Dedicated on-site fire protection team; low-pressure fire hydrant system combined with domestic and industrial water supply

Housing: Located near busy residential areas, meeting accommodation and living needs for workers

Healthcare: Binh Duong’s healthcare system fully meets medical and treatment needs

Education: Complete education system from kindergarten upwards

(Note: all information above is for reference only. Actual information will be calculated according to the current time)

Compare listings

Compare
Robert
  • Robert
Gọi Hotline
zalo-icon
Chat Facebook