Industrial Park of Phan Thiet Phase 1, Binh Thuan Province

Industrial Park of Phan Thiet Phase 1, Binh Thuan Province. Area: 68.358 ha – Duration: 1998–2048.

Phan Thiet Industrial Park Phase 1 was established according to the detailed construction planning approved by the Ministry of Construction under Decision No. 1344/QĐ-BXD dated December 10, 1998. The infrastructure investor is Binh Thuan Building Materials and Minerals Company. On May 24, 1999, Phan Thiet Industrial Park Phase 1 was officially constructed in Phong Nam Commune, Phan Thiet City, and Ham Liem Commune, Ham Thuan Bac District, Binh Thuan Province.
On June 26, 2007, the Provincial People’s Committee issued Decision No. 1634/QĐ-UBND approving the adjustment of land use structure planning for Phan Thiet Industrial Park Phase 1. Later, on June 18, 2018, the Provincial People’s Committee issued Decision No. 1528/QĐ-UBND approving the partial adjustment of the detailed planning and construction management regulations for Phan Thiet Industrial Park Phase 1. Accordingly, the land use structure of the 68.358-hectare area was officially adjusted.
Phan Thiet Industrial Park Phase 1 is the only fully occupied industrial park, with 31 registered projects. However, 7 projects have currently ceased operations due to difficulties.

Location

Phan Thiet Industrial Park Phase 1 is located in Phong Nam Commune, Phan Thiet City, and Ham Liem Commune, Ham Thuan Bac District, Binh Thuan Province. The park is ideally located within Phan Thiet City, ensuring excellent accessibility to transport infrastructure and social amenities such as worker housing, markets, schools, hospitals, entertainment, and other essential services.

Infrastructure

Internal Transportation
Phan Thiet Industrial Park 1 is designed with a spacious and flexible internal road system. The main roads have 4–6 lanes, and branch roads have 2 lanes, ensuring smooth internal circulation for enterprises and factories.

Electricity System
Electricity is supplied from an on-site transformer station with a capacity of up to 17 MVA. A 22KV power line network connects directly to each factory, guaranteeing stable and continuous power for all production needs.

Public Lighting System
The lighting system is independently designed from the main power supply network, installed along all major internal roads.

Water Supply System
The park provides high-quality clean water with a capacity of up to 3,500 m³/day, ensuring a continuous supply for both production and domestic use.

Drainage System (Wastewater and Rainwater)
A complete rainwater drainage system has been constructed throughout the industrial park.

Waste Treatment
Solid waste treatment complies with state standards and regulations, with a maximum capacity of 150–300 tons/day.

Wastewater Treatment
The wastewater treatment plant employs advanced technology with a capacity of 2,800 m³/day, ensuring that discharged water meets environmental safety standards.

Telecommunication System
A full telecommunication network connects the park to the national postal system, providing comprehensive and reliable communication services for investors.

Khu công nghiệp Thạch Thất-Quốc Oai-Hà Nội

Main industries in industrial parks

Phan Thiet Industrial Park 1 focuses on attracting investment in clean industries such as environmental technology, renewable energy, and eco-friendly manufacturing.
The main industries include:

  • Ceramic, wood, and interior decoration manufacturing
  • Garment and household goods production
  • Electrical, electronic, and mechanical industries
  • Building materials production
  • Agricultural, forestry, and aquatic product processing
  • Food, fruit, and beverage processing
  • Consumer goods, footwear, and textile production
  • Mechanical assembly and manufacturing
  • Clean, non-polluting industries

Labor costs

Located in Zone II (Phong Nam Commune, Phan Thiet City, and Ham Liem Commune, Ham Thuan Bac District), the current minimum regional wage is 4,160,000 VND/month.

Social infrastructure

  • Customs Services: Convenient import and export procedures.
  • Banks: OceanBank, Vietcombank, BIDV, PG Bank, SeABank, VietinBank, Techcombank, etc.
  • Postal Services: TDT Express, VNPT, DHL, FedEx, TNT – offering door-to-door delivery.
  • Bus Network: Convenient routes connecting the park with other provinces.
  • Fire Protection: Fire hydrants installed throughout the park to ensure effective fire safety.
  • Accommodation: 5 ha reserved for facilities such as restaurants, banks, and housing for workers and experts.
  • Healthcare: Phan Thiet City hosts a complete healthcare system with hospitals and medical centers.
  • Education: Full education system at all levels available within Phan Thiet City.

Investment advantages

Enterprises investing in Phan Thiet Industrial Park 1 enjoy a preferential corporate income tax rate of 17% for the first 10 years, with a 100% tax exemption for the first 2 years and a 50% reduction for the Next 4 years. This policy helps reduce operational costs, enhances competitiveness, and encourages long-term investment.

(Note: all information above is for reference only. Actual information will be calculated according to the current time)

💠Learn more about us:

🏢 Investing VietnamVietnam Real EstateVietnam industrial parkBlue Ocean Realty

👍 Fanpage: blueoceanrealtyvn

▶️ Youtube: BlueOceanRealty@batdongsanbor , @blueoceanrealtyvietnam

📸 Instagram: blueoceanrealtyvn

💃 Tiktok: @bortintuc

📲 Hotline/ Zalo: +84888089696

Compare listings

Compare
Search
Phạm vi giá Từ Đến
Robert
  • Robert
Gọi Hotline
zalo-icon
Chat Facebook