Thanh Hai Industrial Park – Ninh Thuan Province. Area: 77.987 ha – Operation Term: 2015–2065

General Introduction
Thanh Hai Industrial Park was approved by the Prime Minister for conversion from Thanh Hai Industrial Cluster into Thanh Hai Industrial Park under Document No. 620/TTg-KTN dated May 5, 2015, and was officially established under Decision No. 1409/QD-UBND dated June 25, 2015 by the Chairman of Ninh Thuan Provincial People’s Committee.
Objective: To develop a centralized industrial park with synchronous and modern infrastructure that meets the requirements of advanced production technologies, creating high-quality products that meet international standards, ensuring high productivity for both domestic consumption and export.
Thanh Hai Industrial Park is strategically located at the intersection of three major transport axes — National Highway 1, the North–South railway, and National Highway 27 leading to the Southern Central Highlands and major cities such as Da Lat, Nha Trang, and Ho Chi Minh City — about 4 km from Phan Rang–Thap Cham City center.
Thanh Hai IP is one of four major industrial zones in Ninh Thuan Province featuring comprehensive infrastructure and attractive investment incentives such as land rent exemption and corporate income tax exemption. Currently, the park has achieved a 100% occupancy rate with 18 projects from both domestic and foreign investors, including investors from Japan, South Korea, Taiwan, and Singapore.
To address the limited land availability, Ninh Thuan Province is currently investing in infrastructure expansion to add 20 ha to Thanh Hai Industrial Park.
Thanh Hai Industrial Park is located at the intersection of three major strategic transport routes — National Highway 1, the North–South railway, and National Highway 27 leading to the Southern Central Highlands and connecting to major cities such as Da Lat, Nha Trang, and Ho Chi Minh City.

Internal Transportation:
The main trunk roads include two lanes, each 14 meters wide. The internal road system consists of two lanes, each 11 meters wide, ensuring smooth movement and cargo transportation for enterprises.
Power Supply:
The power system includes electricity for production and lighting. The power is supplied from the 110/22 KV Thap Cham substation, ensuring stable electricity for production and operation, maintaining safety distances from other constructions, and aligning with the regional master plan.
Public Lighting:
The road lighting network is designed independently from the residential power system and installed along internal roads throughout the industrial park.
Water Supply:
The water supply for the park comes from the Phan Rang Water Plant, with a main pipeline running along National Highway 1, providing a total flow rate of Qtb = 48.8 l/s. The industrial park’s pumping station has a capacity of 2,000 m³/day-night, with a 1,000 m³ reinforced concrete reservoir and a secondary pumping station capacity of 228 m³/h. Fire hydrants are installed every 120–150 meters along main routes.
Wastewater and Stormwater Drainage:
External rainwater is collected through open stone-built canals, while internal stormwater is collected through reinforced concrete-covered drains and discharged into the Bau canal.
Waste Treatment:
Solid waste management meets national standards and regulations.
Wastewater Treatment:
The wastewater treatment plant has a total capacity of 1,400 m³/day-night. Both industrial and domestic wastewater are pre-treated and then conveyed to the centralized treatment plant. The treated wastewater meets Category A standards before discharge.
Telecommunications:
The park has an integrated telecommunications system connected through the regional post and telecommunications network, ensuring stable, high-speed communication and providing all essential telecommunication services for investors.
Thanh Hai Industrial Park prioritizes the following industries:
Thanh Hai Industrial Park is located in Thanh Hai Commune and Van Hai Ward, Ninh Thuan Province, classified as Region III. Therefore, the current regional minimum wage is VND 3,640,000 per month.
(Note: all information above is for reference only. Actual information will be calculated according to the current time)
💠Learn more about us:
—
Your trusted partner in Vietnam Real Estate, Industrial Parks, and Invest Vietnam.
Stay Connected:
📲 Hotline/ Zalo: +84888089696
—
Compare listings
ComparePlease enter your username or email address. You will receive a link to create a new password via email.